• Name of Project: Conversion in Diamond Sampling Vessel
  • Scope of Work: Design of conversion: structural calculation and drawings for new accommodation module / strenght deck / moonpool / helideck, stability checks and booklet, piping systems, cost budgeting, project management (design / yard / class).

Machinery: Procurement ad installation of main engines, thrusters, new DP2 replacing old one.

Steelwork: New tier of main deck strengthening 5-10 t/sqm, installation of new complete accommodation modules, design and installation of ICAO compliant helideck, installation of 8x8m moonpool complete with top sliding doors and bottoms doors, design and installation of mining and sampling plants and tools.

Dynamic Positioning: FMEA study, with relevant reports of non-conformities and trouble shooting. Issuance of the FMEA TEST PROGRAMME and coordination of the sea trials, including interface with Classification Society both for approval of documents and execution of surveys.

Conversion in Sampling Vessel DP2 – SPS